EV Mechanica

Subscribe to EV Mechanica's Current Newsletter & never miss an update!

    Close Menu
      Facebook X (Twitter) Instagram
      EVMechanicaEVMechanica
      EVMechanicaEVMechanica
      • Home
      • News
        • E-Mobility
        • EV Battery
      • Charging Stations
      • Policy
      • Research
      • Interview
      • Jobs
      • Events
      • E-Mag
      • Subscription
      Facebook YouTube LinkedIn WhatsApp
      EVMechanicaEVMechanica
      Home » StoreDot Prototype Cells Breaks Record in Achieving High Speed EV Charging

      StoreDot Prototype Cells Breaks Record in Achieving High Speed EV Charging

      AbdullahBy AbdullahFebruary 14, 2024 EV Battery 3 Mins Read
      StoreDot
      Share
      Facebook Twitter LinkedIn WhatsApp

      StoreDot has made progress on the development of its next-phase technology roadmap.

      This builds on its previously announced introduction of production-readiness cells capable of 100 miles / 160 kilometres in 5 minutes this year, and 100 miles in 3 minutes by 2028, as the company continues its path towards commercialization.

      This advancement relies on a suite of holistic design and engineering upgrades to the entire battery system, rather than focusing purely on charging speed. StoreDot’s ‘100in4’ technology prioritizes increased energy density and a myriad of technological enhancements. By taking this system approach, the company aims to maximize real-world performance with the available charging infrastructure.

      Specifically, StoreDot is targeting at least a 10% improvement in energy density compared to its 100 in 5 cells. This will enable more mileage from a charge with the existing charging rates.

      The key to achieving this is optimizing multiple aspects of the battery, including chemistry, cell and pack engineering, cooling design, and modifications to internal connections.

      For the ‘100in4’ technology, StoreDot states that it has already achieved 1100 XFC cycles in a small form factor cell, with a projected energy density of 340Wh/kg in a large EV form factor.

      This milestone comes earlier than planned, and the company will continue refining its XFC technology on the path to production-ready cells that deliver 100 miles charged in just 4 minutes by 2026.

      The small form factor 100in4 prototype utilizes a small capacity (3Ah) multi-layer battery cell with internal electrode layers similar to the larger battery cells StoreDot already has proven and scaled up for EV packs, show the scalability and maturity of the prototype cell.

      According to Doron Myersdorf, CEO of StoreDot, “By taking a balanced, system-level approach, we are unlocking the full potential of our XFC battery technology to maximize real-world performance. Rather than prioritizing charging speed, our plan focuses on technological enhancements across the board – energy density, cell and pack design, chemistry, and cooling optimization. The result is an extremely fast charging experience that can be easily deployed on today’s infrastructure.

      “While this is an early prototype and there are still challenges to overcome, we can draw from our experience of seamlessly scaling up from a 3Ah to a >100Ah EV grade cell within months. We believe our roadmap provides a sustainable, practical, and proven path to delivering extreme fast charging that will accelerate mass EV adoption. We remain ahead of schedule for our planned milestones as we continue our path to commercialization.”

      StoreDot recently announced anticipated 2024 milestones including the demonstration of the world’s first EV pack equipped with XFC technology, shipping prismatic B-samples to OEMs, and expanding its operations in the US.

      StoreDot remains on track with the production-readiness of XFC cells that can deliver 100 miles charged in 5 minutes this year, 100 miles charged in 4 minutes in 2026 and 100 miles charged in 3 minutes by 2028.

      battery cell cell energy density EV pack pack design Storedot XFC technology
      Share. Facebook Twitter LinkedIn WhatsApp
      Abdullah

      More article from Abdullah

      Keep Reading

      Bihar Set to Deploy 150 Electric Buses August

      Tesla Unveils Oasis Supercharger with Solar, Off-Grid Batteries

      Heybike Galaxy series debuts with sleek, powerful e-bikes

      Leave A Reply Cancel Reply

      four − three =

      E-MOBILITY

      Bihar Set to Deploy 150 Electric Buses August

      July 4, 2025

      Heybike Galaxy series debuts with sleek, powerful e-bikes

      July 4, 2025

      Mahindra launches XEV 9e Pack Two in India

      July 4, 2025

      Matter aims to sell 10,000 electric motorcycles in 2025

      July 4, 2025

      Articles

      Delhi’s Fuel Ban Flip-Flop: A Policy Failure in Motion

      Introduction: A Capital Confusion Delhi government took a U-turn on its decision to implement the…

      India’s Largest Electric Bus Procurement Signals a Green Public Transit Revolution

      The Government of India has introduced the largest electric mobility project to date the procurement…

      Delhi’s Vehicle Age Ban: A Harsh Road to Clean Air or Policy Misfire?

      The government took fairly bold action to address Delhi’s chronic air pollution crisis by implementing…

      © 2025 EVMechanica.com.
      • Home
      • About Us
      • Contact Us
      • Subscription

      Type above and press Enter to search. Press Esc to cancel.