EV Mechanica

Subscribe to EV Mechanica's Current Newsletter & never miss an update!

    Close Menu
      Facebook X (Twitter) Instagram
      EVMechanicaEVMechanica
      EVMechanicaEVMechanica
      • Home
      • News
        • E-Mobility
        • EV Battery
      • Charging Stations
      • Policy
      • Research
      • Interview
      • Jobs
      • Events
      • E-Mag
      • Subscription
      Facebook YouTube LinkedIn WhatsApp
      EVMechanicaEVMechanica
      Home » Record Growth in Generation Seen in 2022 by NTPC

      Record Growth in Generation Seen in 2022 by NTPC

      Aishwarya SaxenaBy Aishwarya SaxenaJuly 4, 2022 E-Mobility 2 Mins Read
      Share
      Facebook Twitter LinkedIn WhatsApp

      India’s largest energy conglomerate NTPC and its group companies have revealed a record generation of 104.4 BU in the first quarter from April to June 2022, and registering an increase of 21.7% from 85.8 BU generated in the corresponding quarter last year.

      NTPC Growth in 2022In June’22, generation was 34.8 BU, higher by 29.3% compared to 26.9 BU in June’21 indicating improved performance and an increase in demand for power in the current year.

      NTPC Talcher Kaniha (3000 MW) in Orissa is the top-performing thermal power plant with a 94.2% Plant Load Factor (PLF) between April to June 2022.

      Overall Plant Load Factor of NTPC Coal stations was 80% from April to June 2022 vis-a-vis 69% in the same period last year, a testimony to the high levels of operational excellence and the expertise of NTPC in the Operation and Maintenance of the power plants.

      NTPC Growth in 2022 can be seen in new business areas like green hydrogen, waste-to-energy and e-mobility. India’s largest power producer is also aiming 10 percent reduction in net energy intensity by 2032.

      NTPC has become India’s first energy company to declare its energy compact goals as part of the UN High-level Dialogue on Energy (HLDE).

      Besides power generation, due to NTPC growth in 2022, the company has diversified into producing energy through cleaner and greener sources such as hydro, wind and solar and also Green Hydrogen solutions.

      The power major has also forayed into a variety of business areas including fuel cells, e-mobility and Waste-to-Energy.

      The total installed capacity of the company is 69,134.20 MW having 23 coal-based, 7 gas-based, 1 Hydro, and 19 renewable energy projects.

      Under JV, NTPC has 9 coal-based, 4 gas-based, 8 hydro and 5 renewable energy projects.

      e-mobility fuel cells Green Hydrogen solutions news NTPC performance thermal power plant
      Share. Facebook Twitter LinkedIn WhatsApp
      Aishwarya Saxena

      More article from Aishwarya Saxena

      Keep Reading

      Tesla on Autopilot stuck, struck by train

      Tesla Model Y Juniper Upgraded for Camping Adventures

      Magenta Mobility Appoints Nand Sharma for EV Expansion

      Leave A Reply Cancel Reply

      ten − 2 =

      E-MOBILITY

      Tesla on Autopilot stuck, struck by train

      June 16, 2025

      Tesla Model Y Juniper Upgraded for Camping Adventures

      June 16, 2025

      Magenta Mobility Appoints Nand Sharma for EV Expansion

      June 16, 2025

      Ghana Launches First E-Bike Plant to Boost Green Transport

      June 16, 2025

      Articles

      Battery Second Life: From Environmental Liability to Economic Opportunity

      As India accelerates toward its ambitious targets of 500 GW of non-fossil fuel power and…

      Global Trends in Electric Two- and Three-Wheelers: India’s Role in Driving the Transition

      The global electric vehicle (EV) market is still emerging. Electric two-wheelers (2Ws) and three-wheelers (3Ws)…

      How EVs are Reshaping Corporate Sustainability Goals Across Industries

      With pressures to meet net-zero targets building across the globe, EVs are becoming an ever…

      © 2025 EVMechanica.com.
      • Home
      • About Us
      • Contact Us
      • Subscription

      Type above and press Enter to search. Press Esc to cancel.